Tuesday, June 15, 2021

 De-burred, dimpled, and primed bottom wing skin.








Wednesday, May 26, 2021

 Riveted top wing skins on right wing.

Tuesday, May 25, 2021

 Riveted top of the front spar on right wing.

Monday, May 17, 2021

Friday, April 23, 2021

 Prepared small .032" root wing skin by de burring the holes, dimpling and priming. Then clecoed the skin on the ribs.




 

Sunday, April 4, 2021

De burred ribs in #1 skin area, dimpled holes, and installed skin.



Saturday, April 3, 2021

 Prepared #1 wing skin on right wing by de burring holes, dimpling, and priming.




Tuesday, March 30, 2021

Removed right wing skin #2 de-burred and dimpled holes, primed inside skin and reinstalled.




Saturday, March 27, 2021

  Removed wing skin #3 de-burred and dimpled holes, primed inside skin and reinstalled.






 

Friday, March 26, 2021

  Removed wing skin #4 de-burred and dimpled holes, primed inside skin and reinstalled.




 

Thursday, March 25, 2021

 Removed wing skin #5 de-burred and dimpled holes, primed inside skin and reinstalled.




Wednesday, March 24, 2021

 Cut slots in right wing skins for strut bars. Dimpled inspection cover rings and covers. Installed nut plates on inspection rings.









Tuesday, March 23, 2021

 Drilled nut plates to fuel tank cover bay.

Monday, March 22, 2021

 Fitted inspection covers to holes in right wing.




Sunday, March 7, 2021

Saturday, March 6, 2021

 Drilled fuel tank cover screw pattern.




Wednesday, February 24, 2021

Monday, February 22, 2021

 Installed fuel tank stiffeners on top skin.



Thursday, February 11, 2021

 Fabricated and fitted small panel below fuel tank bay. Drilled fuel tank cover holes around bay. Still working on right wing.




Wednesday, February 10, 2021

 Fabricated and installed .032" root strip.






Tuesday, February 9, 2021

 Drilled bottom skin to right wing.





Monday, February 8, 2021

 Fitted and drilled bottom skin on right wing.




Saturday, February 6, 2021

Trimmed and drilled #1 skin for right wing.



Friday, February 5, 2021


 Vacuum formed nose, fitted and drilled right wing skin #1





Thursday, February 4, 2021

Formed, fitted and drilled in place #2 wing skin on the right wing.