Saturday, December 8, 2018

Drilled both wings bottom cap strips and de burred.

Monday, December 3, 2018

Drilled for rivets, de-burred, and sanded left wing main spar top cap strips.

Sunday, December 2, 2018

Drilled rivet holes in right top wing cap strips.

Saturday, December 1, 2018

Marked both main spar rib, aileron, flap, and cap strip locations. Sanded right wing top cap strips.

Sunday, November 25, 2018

Cut spar cap strips to length, cut corners and de-burred.
Cut spar web to length.
Marked out drill pattern for top cap strips.



Tuesday, May 22, 2018

Started removing engine from RX-8

Unfortunately
 it was full of water and lots of rust making it
just a lot of spare parts 


Monday, March 26, 2018

Sunday, March 25, 2018

Sunday, February 25, 2018

Friday, February 23, 2018

Wednesday, February 14, 2018


Cut out remaining .125"  spar connecting plates

 A Rabbit.

Tuesday, February 13, 2018


Cut out spar .125" attachment and connecting plates



Sunday, February 11, 2018

Formed Flap and straitened nose ribs
Formed and straitened aileron pocket ribs
Painted full size ribs



Saturday, February 10, 2018

Deburred flap nose ribs
Deburred aileron pocket ribs
Cut counter balance holes in aileron nose ribs




Friday, February 9, 2018

Cutout form blocks for aileron pocket ribs
Cutout aileron pocket ribs
Formed aileron nose ribs





Thursday, February 8, 2018

Flanged small lighting holes in full size rib
Drilled full size rib's  for stiffeners


 

Wednesday, February 7, 2018

Tuesday, February 6, 2018

Monday, February 5, 2018

Sunday, February 4, 2018

Cut out flap rib form blocks and flanging plugs

Saturday, February 3, 2018


Flanged, fluted, and straitened full size ribs

Friday, February 2, 2018

Wednesday, January 31, 2018

Tuesday, January 30, 2018

Made full rib forms
De burred aileron nose ribs