Wednesday, March 26, 2025

 Fabricated wheel break caliper mounts.


 

Thursday, March 20, 2025


 Finished welded control stick assembly and installed.

Tuesday, March 18, 2025

 Welded control stick mounts in fuselage.

Monday, March 17, 2025

 Fabricated control stick bearings and mounting brackets.

Friday, March 14, 2025

 Fabricated control stick aileron drag link.

Tuesday, March 11, 2025

 Completed elevator trim by fabricating trim tab push rods.

Monday, March 10, 2025

 Fabricated control stick end brackets.


 

Tuesday, March 4, 2025

 Fabricated elevator trim actuator rods and outside horns.

Sunday, March 2, 2025

 Installed electric trim mount and horn extension. 



Saturday, March 1, 2025

 Fabricated and installed elevator trim shafts and horns.