Wednesday, November 27, 2019

Riveted center ribs on right wing

Tuesday, November 26, 2019

Riveted center ribs on left wing.

Sunday, November 24, 2019

Fabricated right wing false spar and false spar and short rib attach angles.

Friday, November 22, 2019

Fitted short ribs and fabricated left wing false spar.

Wednesday, November 20, 2019

Removed center ribs and nose ribs, deburred and reinstalled.

Monday, November 11, 2019

Sunday, November 10, 2019

Installed center ribs on left wing.

Wednesday, November 6, 2019

Finished right wing nose rib installation. Set left wing rear spar in fixture.

Tuesday, November 5, 2019

Installed half of right wings nose ribs.

Monday, November 4, 2019

Installed right wing center ribs.

Sunday, November 3, 2019

Squared and leveled right wing in jig

Saturday, November 2, 2019

Constructed wing assembly frame.

Friday, November 1, 2019

Welded left wing flap and aileron drive linkage.