Monday, December 31, 2018

More fitted rib attach angles on left main spar.



Sunday, December 30, 2018

Fitted rib attach angles on left wing.


Wednesday, December 26, 2018

De burred main spar rib attach angles ,drilled for ribs.

Tuesday, December 25, 2018

Cut out 45 main spar rib attach angles.

Monday, December 24, 2018

Be burred and prepared for paint rib spacers.
Cut out 15 rib attach angles.


Sunday, December 23, 2018

Riveted right spar center splice and wing to fuselage fitting.
Drilled right strut fitting to spar.
Cut spar rib spacers to length.
Drilled rivet holes in rib spacers.


Saturday, December 22, 2018

Finished spar to strut fittings.
Drilled strut fittings to left spar.
Riveted right main spar cap strips.


Friday, December 21, 2018

Riveted left spare center splice and wing attach point.
Blanked spar to strut attach fittings,drilled holes, and milled to size.



Thursday, December 20, 2018

Tuesday, December 18, 2018

Prepared left main spare cap strips for paint, Painted left main spare components.

Sunday, December 16, 2018

Drilled light weighting holes, de burred, and prepared for paint left main spar.


Saturday, December 15, 2018

Assembled right main spar. Drilled cap strips, splice plate, and attachment plate to left wing spar.


Friday, December 14, 2018

De-burred finished sanded and painted right wing main spar.



Thursday, December 13, 2018

Drilled center splice for right main spar, cut slot for strut attachment, cut light weighting holes in spare.


Wednesday, December 12, 2018

Drilled cap strips to right wing. Set center splice plates.


Tuesday, December 11, 2018

Drilled cap strips to right wing.

Monday, December 10, 2018

Lay out spar lightening holes and drilled hole centers. Cut 4 rib spacers and drilled.


Saturday, December 8, 2018

Drilled both wings bottom cap strips and de burred.

Monday, December 3, 2018

Drilled for rivets, de-burred, and sanded left wing main spar top cap strips.

Sunday, December 2, 2018

Drilled rivet holes in right top wing cap strips.

Saturday, December 1, 2018

Marked both main spar rib, aileron, flap, and cap strip locations. Sanded right wing top cap strips.